Project:
Broomfield Pump Station

Owner: Northern Colorado Water Conservancy District
Location: Broomfield, Colorado
Completion Date: April 2005
Value: $1,546,264

Scope:

  • Construction of cast in place foundation and floor slab
  • Masonry superstructure
  • Installation of a cast in place concrete Air Gap Structure
  • Piping modifications to existing Flow Control Structure
  • Installation of horizontal split case centrifugal pumps with adjustable frequency drives
  • Installation of in-plant and yard piping
  • Electrical and instrumentation
  • Heating, ventilating and air conditioning

 