HomeAbout StanekContact Us
 
 

Project:
Sedimentation Basins Rehabilitation 1 to 12 at the Point Loma Treatment Plant Design Build

Owner: City of San Diego
Location: San Diego, California
Value: $6,329,000

Scope:

  • Work includes demolition of existing sludge equipment.
  • Design and installation of new sludge collection equipment for the twelve existing basins; including 36 longitudinal and 12 cross collector mechanisms. Each basin consists of 3 bays that are 20 feet wide and 224 feet long.
  • Additional work includes design and construct a new 8-inch water main; standpipe at every two basins to allow for simultaneous connections of fire hoses.
  • Repair of existing coatings and concrete.
  • Installation of 54 stop logs.
  • Modification of the scum spray actuator system.

 

 

 

Stanek Constructors

 

 

 

 

Stanek Constructors

 

Carson

Site Map | Contact Us
© 2009 Stanek Constructors, all rights reserved.