San Luis Obispo, CA

San Luis Obispo Water Treatment Plant

About This Project:

San Luis Obispo Water Treatment Plant

Location: San Luis Obispo, California
MOD:
Contract: $12,130,850

  • Construction of 3 MG and 2 MG above grade steel potable water storage tanks and associated piping and appurtenances.
  • Renovation of the existing above ground wash water storage tank.
  • Construction of a new transfer pump station consisting of masonry and structural steel with EPDM Roofing.
  • Modification and conversion of the two existing 8 mgd flocculation basins to two Actiflo process trains, including installation of equipment provided by the city.
  • Demolition of the wash water reclamation junction box; wash water pumps, transfer pump station and the internal baffles in flocculation basins 1 and 2.
  • Project also includes 175’ of 24” RCP, 524’ of 24” DIP, 212’ of 30” DIP underground pipe installation.
  • Installation of new electrical, instrumentation, and SCADA system.